|
|
|
|
|
|
|
Before Construction Begins |
|
|
|
|
|
|
|
|
|
|
|
|
|
Panels being loaded for delivery |
|
|
|
|
|
|
|
|
|
|
|
|
Thermal Foams ICF foundation |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Wall Panel being raised into place |
|
|
|
|
|
|
|
|
|
|
|
|
Wall panel being cut to fit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Roof Panels lowered into place |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Exterior prior to Dryvit installation |
|
|
|
|
|
|
|
|
|
|
|
|
|
Wires are fished through the factory installed wire chase |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
EPS Architectural Shapes are applied |
|
|
|
|
|
|
|
|
|
|
|
|
Exterior with Dryvit and Architectural shapes applied |
|
|
|
|
|
|
|
|
|
|
|
|
|